For individual lots in proposed subdivision

Contact Harris Environmental Consulting for your on-site wastewater, stormwater, erosion & sediment control or bushfire assessment needs.
Address:
Harris Environmental Consulting
6/1 Memorial Drive
Shellharbour City Centre
NSW 2529
Shellharbour Office: 02 4236 0954
Bowral Office: 02 4862 1168
Mobile: 0425 335 245
Email: info@hec.eco
Office Hours:
Monday - Friday 8am - 6pm
Closed Saturday & Sunday
QUICK LINKS



Call Harris Environmental
on 02 4236 0954
to discuss your project
For individual lots in proposed subdivision
Commercial developments like the one shown in the image, will require a Watercycle Management Study to demonstrate the required stormwater treatment. In the example shown storm water from the exterior hard stand surfaces needed to be treated by biotension basin, sediment basin and constructed wetlands. Where as the wash down water from the putresible waste management system required an anaerobic treatment system followed by constructed wetland.
A Water Cycle Management Study was prepared for a proposed prayer hall and cemetry with on-site wastewater management facilities.
With limited soil depth and available land, this project needed an Aerated Water Treatment System and 4 sand mounds.